Cowe Falls, LynneKamranian, Zahra2018-01-312018-01-312018-01-25Kamranian, Z. (2018). Load Evaluation of the Hay River Bridge Under Different Platoons of Connected Trucks (Master's thesis, University of Calgary, Calgary, Canada). Retrieved from https://prism.ucalgary.ca. doi:10.11575/PRISM/5454http://hdl.handle.net/1880/106373Cold weather, great distances, low population and high transportation costs in the North West Territories (NWT); make it a desirable location to use platooning technology. This research evaluates the performance of the Hay River Bridge, which is located on the main road from Edmonton to Yellowknife, under platoons of connected trucks. The bridge load evaluation under platoons of two, three and four Alberta Non-Permit (NP) legal trucks shows enough capacity using PC-specific permit conditions. Furthermore, the bridge load evaluation under a platoon of two Alberta legal NP trucks shows enough capacity with PS-specific permit conditions. The bridge is able to tolerate platoons consist of three or four reduced weight of Alberta NP trucks under PS permit conditions.engUniversity of Calgary graduate students retain copyright ownership and moral rights for their thesis. You may use this material in any way that is permitted by the Copyright Act or through licensing that has been assigned to the document. For uses that are not allowable under copyright legislation or licensing, you are required to seek permission.EngineeringEngineering--CivilLoad Evaluation of the Hay River Bridge Under Different Platoons of Connected Trucksmaster thesis10.11575/PRISM/5454