Project schedule review: delay causes and mitigation strategies for hospital renovation projects
dc.contributor.advisor | Ruwanpura, Janaka | |
dc.contributor.author | Pankiw, Apollinaria | |
dc.date.accessioned | 2005-08-16T17:17:07Z | |
dc.date.available | 2005-08-16T17:17:07Z | |
dc.date.issued | 2004 | |
dc.description | Bibliography: p. 230-237 | en |
dc.format.extent | v, 265 leaves : ill. ; 30 cm. | en |
dc.identifier.citation | Pankiw, A. (2004). Project schedule review: delay causes and mitigation strategies for hospital renovation projects (Master's thesis, University of Calgary, Calgary, Canada). Retrieved from https://prism.ucalgary.ca. doi:10.11575/PRISM/11764 | en_US |
dc.identifier.doi | http://dx.doi.org/10.11575/PRISM/11764 | |
dc.identifier.isbn | 0494037245 | en |
dc.identifier.lcc | AC1 .T484 2004 P364 | en |
dc.identifier.uri | http://hdl.handle.net/1880/41863 | |
dc.language.iso | eng | |
dc.publisher.institution | University of Calgary | en |
dc.publisher.place | Calgary | en |
dc.rights | University of Calgary graduate students retain copyright ownership and moral rights for their thesis. You may use this material in any way that is permitted by the Copyright Act or through licensing that has been assigned to the document. For uses that are not allowable under copyright legislation or licensing, you are required to seek permission. | |
dc.title | Project schedule review: delay causes and mitigation strategies for hospital renovation projects | |
dc.type | master thesis | |
thesis.degree.discipline | Civil Engineering | |
thesis.degree.grantor | University of Calgary | |
thesis.degree.name | Master of Science (MSc) | |
ucalgary.thesis.accession | Theses Collection 58.002:Box 1527 520492044 | |
ucalgary.thesis.notes | UARC | en |
ucalgary.thesis.uarcrelease | y | en |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- ucalgary_2004_pankiw_apollinaria_486686.pdf
- Size:
- 23.99 MB
- Format:
- Adobe Portable Document Format
- Description:
- Thesis