Project schedule review: delay causes and mitigation strategies for hospital renovation projects

dc.contributor.advisorRuwanpura, Janaka
dc.contributor.authorPankiw, Apollinaria
dc.date.accessioned2005-08-16T17:17:07Z
dc.date.available2005-08-16T17:17:07Z
dc.date.issued2004
dc.descriptionBibliography: p. 230-237en
dc.format.extentv, 265 leaves : ill. ; 30 cm.en
dc.identifier.citationPankiw, A. (2004). Project schedule review: delay causes and mitigation strategies for hospital renovation projects (Master's thesis, University of Calgary, Calgary, Canada). Retrieved from https://prism.ucalgary.ca. doi:10.11575/PRISM/11764en_US
dc.identifier.doihttp://dx.doi.org/10.11575/PRISM/11764
dc.identifier.isbn0494037245en
dc.identifier.lccAC1 .T484 2004 P364en
dc.identifier.urihttp://hdl.handle.net/1880/41863
dc.language.isoeng
dc.publisher.institutionUniversity of Calgaryen
dc.publisher.placeCalgaryen
dc.rightsUniversity of Calgary graduate students retain copyright ownership and moral rights for their thesis. You may use this material in any way that is permitted by the Copyright Act or through licensing that has been assigned to the document. For uses that are not allowable under copyright legislation or licensing, you are required to seek permission.
dc.titleProject schedule review: delay causes and mitigation strategies for hospital renovation projects
dc.typemaster thesis
thesis.degree.disciplineCivil Engineering
thesis.degree.grantorUniversity of Calgary
thesis.degree.nameMaster of Science (MSc)
ucalgary.thesis.accessionTheses Collection 58.002:Box 1527 520492044
ucalgary.thesis.notesUARCen
ucalgary.thesis.uarcreleaseyen
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
ucalgary_2004_pankiw_apollinaria_486686.pdf
Size:
23.99 MB
Format:
Adobe Portable Document Format
Description:
Thesis
Collections