An Assessment Tool for Measuring and Enhancing Innovation in Construction Projects

dc.contributor.advisorJergeas, George Farage
dc.contributor.authorAlhomadi, Ahmad Awaduallah
dc.contributor.committeememberRuwanpura, Janaka
dc.contributor.committeememberLozon, Jim
dc.date2018-06
dc.date.accessioned2018-02-28T22:05:00Z
dc.date.available2018-02-28T22:05:00Z
dc.date.issued2018-02
dc.description.abstractInnovation is essential to maintaining competitiveness, improving performance, increasing national economic growth, and contributing to a knowledge-based economy. The construction industry is one of the leading economic contributors in today’s societies. However, the industry is fragmented, diverse, and challenged with a constantly changing business environment and increasing complexity and sophistication. By investing in innovations, the industry seeks to promote performance and sustain competitiveness. The construction industry is mainly project-based, and project level innovation plays a key role in enhancing the performance of project-based companies. The main objective of this research, therefore, was to holistically investigate the factors influencing innovation processes and their diffusion outputs in the construction project context and develop an assessment tool that can help firms measure and benchmark innovation levels on construction projects. A multiphase mixed methods design was conducted, where the different phases interrelate to address the main research objective. The research design encompassed three main sequential phases. The first phase involved the collection and analysis of qualitative data using semi-structured interviews and an exploratory survey. This was followed by a development phase of translating the qualitative findings into a quantitative questionnaire instrument. Then the quantitative phase involved administering the developed instrument to a representative sample in Canada to measure the extent of innovation within the construction projects. The analysis of the quantitative data entailed several statistical procedures, particularly, exploratory factor analysis, scales reliability analysis, and multiple regression analysis. As a result, factor influencing innovation process and their outputs were examined, their prevalence within the context of construction projects was measured, and key factors and their relationships were identified. A construction project innovation assessment tool (CPIAT) was developed based on a synthesis of the results from the previous phases with 13 rigorous innovation indicators. Furthermore, the CPIAT was applied on two different construction projects and showed consistency and efficiency in meaningfully benchmarking construction projects’ innovation.en_US
dc.identifier.citationAlhomadi, A. A. (2018). An Assessment Tool for Measuring and Enhancing Innovation in Construction Projects. (Doctoral thesis, University of Calgary, Calgary, Canada). Retrieved from https://prism.ucalgary.ca. doi:10.11575/PRISM/9358en_US
dc.identifier.doihttp://dx.doi.org/10.11575/PRISM/9358
dc.identifier.urihttp://hdl.handle.net/1880/106408
dc.language.isoeng
dc.publisher.facultyGraduate Studies
dc.publisher.facultySchulich School of Engineering
dc.publisher.institutionUniversity of Calgaryen
dc.publisher.placeCalgaryen
dc.rightsUniversity of Calgary graduate students retain copyright ownership and moral rights for their thesis. You may use this material in any way that is permitted by the Copyright Act or through licensing that has been assigned to the document. For uses that are not allowable under copyright legislation or licensing, you are required to seek permission.
dc.subjectinnovation
dc.subjectInnovation measurement
dc.subjectInnovation in Construction Projects
dc.subjectConstruction Innovation
dc.subject.classificationEngineering--Civilen_US
dc.titleAn Assessment Tool for Measuring and Enhancing Innovation in Construction Projects
dc.typedoctoral thesis
thesis.degree.disciplineCivil Engineering
thesis.degree.grantorUniversity of Calgary
thesis.degree.nameDoctor of Philosophy (PhD)
ucalgary.item.requestcopytrue
ucalgary.thesis.checklistI confirm that I have submitted all of the required forms to Faculty of Graduate Studies.en_US
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
ucalgary_2018_alhomadi_ahmad.pdf
Size:
63.99 MB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.74 KB
Format:
Item-specific license agreed upon to submission
Description: